6.2.2 Electricity

  • The building should have a three-phase line and all power cables should be in good condition.
  • The power meter should be in working condition and be able to take on any additional power load needed by CARE.
  • All electrical outlets must be safe and leak-proof.
  • The capacity to accommodate a heavy duty generator should exist.
  • All outstanding electricity bills should be paid by the landlord before the building is handed over.